Electrical Lead (m/f/d) Data Center Construction
Ihre Tätigkeiten
PORR is expanding its data center activities and is seeking an Electrical
Lead to manage electrical site delivery on a large data center construction
project. The role covers electrical installation, subcontractor
coordination, technical interfaces, procurement follow-up, quality control,
testing support, and commissioning readiness.
- Leadership of electrical works on site, including containment, cabling, switchgear, LV/MV systems, UPS, generators, earthing, lighting, life safety interfaces, and testing support
- Coordination of electrical subcontractors and verification of compliance with current drawings, specifications, and approved method statements
- Review of electrical drawings, technical submissions, procurement status, and installation details
- Coordination of electrical interfaces with mechanical, CSA, BMS, security, telecoms, fire protection, and commissioning teams
- Tracking of long-lead equipment, access requirements, energisation milestones, and testing readiness
- Coordination of inspections with QA/QC and completion of test records, checklists, and handover documents
- Support in planning of energisation, pre-commissioning, and commissioning activities
- Safe control of electrical works, including permits, isolations, and energised-area rules
Ihr Profil
- Degree in electrical engineering or comparable electrical qualification
- Minimum 8 years' electrical construction experience on large projects
- Experience in data center, mission-critical, industrial, energy, or high-tech projects preferred
- Strong knowledge of LV/MV systems, power distribution, generators, UPS, containment, cabling, earthing, testing, and commissioning interfaces
- Good understanding of redundancy, critical power paths, energisation sequence, and documentation requirements
- Experience managing electrical subcontractors and vendor packages
- Relevant electrical qualifications or authorisations desirable
- Fluency in English; German or Polish language skills advantageous